Log In

Reset Password
BERMUDA | RSS PODCAST

Causeway bridge closures

Repairs: The temporary Longbird Bridge is being resurfaced this weekend.

The temporary bridges at the Causeway will be closed this weekend for more anti-skid resurfacing work.

The Ministry of Works and Engineering carried out the first work on the bailey bridges in January and will repeat the process tomorrow and Sunday.

The bridges will be closed from 7.30 a.m until 4.p.m. tomorrow and Sunday. They are being closed individually on each respective day for the repairs and traffic signals will be used to manage traffic through the remaining open section of the bridge.

Motorists are being asked to cooperate with the traffic signals on site and to travel at the 20 kph speed limit on the bridge.